Key attributes | |
Industry-specific attributes | |
packaging type | Bottles, Bags, Film, Foil |
packaging material | Plastic, paper |
driven type | Electric |
Voltage | 110v/220v/380v |
Other attributes | |
max speed | 40pcs/min |
automatic grade | Automatic |
warranty | 2 years |
Application | Food, Beverage, Commodity, Chemical, Machinery & Hardware, APPAREL, Textiles |
dimension(l*w*h) | 1850*830*1100mm |
key selling points | High-accuracy |
core components | motor |
Product name | Automatic Flaps Folding Carton Sealing Machine |
Suitable for | Plastic Bag Packing |
Keyword | Hot Sealer |
Function | High Effieciency |
Material | Steel |
Feature | Work Efficiently |
Advantage | Automatic Easy |
Type | SEALING MACHINE |
Showroom Location | None |
Condition | New |
Warranty of core components | 1 Year |
Applicable Industries | Hotels, Garment Shops, Building Material Shops, Manufacturing Plant, Machinery Repair Shops, Food & Beverage Factory, Farms, Restaurant, Home Use, Retail, Food Shop, Printing Shops, Construction works聽, Energy & Mining, Food & Beverage Shops, Advertising Company, Other |
Weight | 120 |
Shipping Methods: Vietnamese manufacturers commonly offer both sea freight and air freight options. Sea freight is cost-effective for large or heavy equipment, while air freight is suitable for time-sensitive deliveries. For instance, A&B Vietnam notes that from the time of deposit to loading for shipment, it takes about 10–30 days, depending on the product and packaging specifications .
Shipping Costs: Costs are typically borne by the buyer unless specified otherwise. Terms like "Prepaid & Add" indicate that the seller pays the freight charges upfront and then adds them to the buyer's invoice. Alternatively, "Collect" means the buyer arranges and pays for shipping directly with the carrier .
Click here to change this text. Ac non ac hac ullamcorper rhoncus velit maecenas convallis torquent elit accumsan eu est pulvinar pretium co
Packaging: Equipment is usually secured in custom wooden crates or on pallets to ensure safety during transit. Proper labeling, including the shipper's name, contents, and purchase order number, is standard practice. Hanpak Vietnam specifies that machinery should be wrapped in sticky plastic or tightly wrapped in cartons, and packages must be packed on pallets and wooden crates, depending on the characteristics of the machine .
Shipping Terms: Many manufacturers operate under "Free On Board" (FOB) terms, where the seller's responsibility ends once the goods are loaded onto the transport vessel. From that point, the buyer assumes all risks and costs. Alternatively, "Free Carrier" (FCA) terms may be used, where the seller delivers the goods to a specified location, and the buyer assumes responsibility from that point .
Estimated Delivery: Delivery times are estimates and can be influenced by factors such as production schedules, shipping methods, and unforeseen events. For example, A&B Vietnam indicates that the time from deposit to loading for shipment takes about 10–30 days, depending on the product and packaging specifications .
Delays: Manufacturers typically are not liable for delays caused by events beyond their control, including natural disasters, strikes, or transportation issues.
Shipping Documents: Standard documents include the bill of lading, commercial invoice, packing list, and certificate of origin.
Insurance: Unless specified, insurance is often the buyer's responsibility. Under terms like "Delivered Duty Unpaid" (DDU), the seller delivers the goods to a specified location, but the buyer is responsible for import duties and further transportation costs.
Taxes & Duties: Prices usually exclude taxes, duties, and other governmental charges. Buyers are responsible for these unless otherwise agreed upon.
Installation Services: Some manufacturers offer installation services, which should be detailed in the purchase agreement if applicable.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit Tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.